Stage 01
Survey
We visit the site to take measurements, review slab levels, openings, services, and finish details, then prepare and submit drawings within five working days.
Output: site report, sketch, indicative budget
Stage 02
Design
Steel detailing and structural load calculations handled in house, followed by engineering review, DM submission drawings, finish specification, and third party inspection and certification where required for final approvals.
Output: shop drawings, weld map, BoQ, finish board
Stage 03
Fabricate
Our welders, fitters, and fabrication team build each steel component in house, handling cutting, fitting, welding, and finishing to approved shop drawings. CNC laser cutting and precision bending support sheet, plate, tube, and pipe fabrication, while structural welding is carried out to AWS standards using procedures suited to each joint and project requirement.
Output: fit-up photos, weld certs, finish samples
Stage 04
Install
Our installation team manages on site execution in coordination with interior contractors, MEP teams, glaziers, and architects to ensure smooth project integration and timely handover.
Output: as-built, maintenance schedule