Output 01

Structural steel detailing

Assembly, single-part, anchor-bolt and erection drawings produced across Tekla Structures and AutoCAD project environments, with welding symbols to AWS A2.4 and dimensions to ISO 129-1.

  • Tekla Structures workflows
  • AutoCAD and Advance Steel workflows
  • AWS A2.4 weld symbols

Output 02

BIM coordination

IFC export, federated clash review across Navisworks-based project environments, and ISO 19650 BEP-compliant information delivery. We work to any client’s LOD/LOI matrix.

  • IFC 2x3 / IFC 4 export
  • Navisworks clash review
  • ISO 19650 information mgmt

Output 03

CNC nesting & CAM

DXF/DSTV export, sheet nesting for the 6 kW lasers, tube notching and bend-deduction calculation for the 170 t CNC press. Output ready for the floor.

  • DSTV NC1 export
  • Sheet-utilisation nesting
  • Bend allowances

Output 04

Bespoke 3D modelling

Bespoke-part modelling for SOLIDWORKS project environments: feature staircase strings, sculpture armatures, helical balustrades and complex tube intersections. Drawings linked to the model for revision control.

  • SOLIDWORKS project environments
  • 3D PDF for review
  • Sheet-metal flat patterns
CNC laser cutting from shop drawing on the workshop floor

D.01 Why detail in-house

The detailer talks
to the foreman.

Most steel detailing in Dubai is outsourced to a remote bureau working off a PDF. By the time the question reaches the bureau, the steel is already cut. Our detailers sit ten metres from the laser and the press brake. Connections are designed for what we can actually fabricate and how we erect on site.

We start from your consultant’s stamped general arrangement and structural calculations, develop connections to AISC 303 / BS EN 1090, and run an internal squad check before drawings ever leave the office. The result is a fabrication-ready set that doesn’t bounce back from the floor with RFIs.

D.02 Deliverables

What we hand over.

Deliverable 01

Approval set

PDF shop drawings for consultant approval before fabrication: assembly drawings, anchor-bolt setting plans, erection sequence and bolt schedule. Returned with consultant’s stamp.

Deliverable 02

Fabrication set

Approved-for-construction (AFC) drawings on the workshop floor: single-part drawings, weld maps with AWS A2.4 symbols, mill-cert pull list, paint and galvanizing schedule, NDT scope.

Deliverable 03

CNC & CAM files

DSTV NC1 files for the beam/tube line, DXF nests for the 6 kW lasers, bend-allowance schedules for the press brake. Everything traceable back to its drawing rev.

Deliverable 04

As-built model

Federated IFC and structural model updated for every site variation, with a Common Data Environment (CDE) deliverable per ISO 19650 where the project BEP requires it.

Deliverable 05

Erection package

Site issue: piece-marked assembly drawings, bolt-tag count, lifting points, sequence diagrams, and a foreman-friendly index. Marked-up corrections close the loop back into the model.

Deliverable 06

QA/QC pack

WPS index, weld inspection logs, mill cert pack, MPI & pull-out test reports, paint & galvanizing DFT logs, anchor torque records. Drawing-aligned for handover.

Shop Drawings & Detailing FAQs (Dubai & UAE)

Steel shop drawings translate a consultant’s stamped general arrangement (GA) into the piece-marked, weld-symbolled, dimensioned output the workshop floor and the erector actually use. The split between consultant’s drawings and fabricator’s shop drawings is defined globally by AISC 303 (Code of Standard Practice for Steel Buildings and Bridges) and in Europe by BS EN 1090-1. Finesse details in-house under both, with full ISO 19650 BIM information management where the project demands it.

What are structural steel shop drawings?

Shop drawings are the production information a workshop and an erection team actually build from. They translate the approved design into the exact geometry of every piece: cutting lengths, hole positions, weld preparation, bolt sizes and grades, part marks and assembly marks.

They are not a redrawn version of the consultant's drawings. A consultant's general arrangement says what the structure is; shop drawings say how each piece is made, marked, delivered and put together on site.

What is the difference between structural calculations and shop drawings?

Calculations establish the design: the loads on the structure, the member and connection requirements, and the strength, stability and serviceability checks that show it works. Shop drawings translate that approved design information into fabrication and erection information.

On most projects the two are sequential, and connection design is where they meet. Where a project delegates connection design to the fabricator, the calculation result drives the detail; where the consultant designs the connections, the detail follows their design. See structural design & calculations.

What is included in a steel shop drawing package?

  • General arrangement and erection drawings showing how the structure goes together;
  • Assembly drawings for each fabricated assembly;
  • Single-part drawings for the individual pieces;
  • Anchor-bolt and base-plate setting-out drawings;
  • Connection details, weld symbols and bolt schedules;
  • A bill of materials and part marking;
  • The associated model and machine files where the project calls for them.

The exact make-up is set by the project. See what we hand over above for the full list.

Do you prepare erection and GA drawings?

Yes. Erection and general arrangement drawings are what the site team sets out and builds from: grid lines and levels, the position and orientation of every assembly, erection marks, and the sequence and temporary stability requirements where those matter.

They are also the drawing the consultant reviews to confirm the detailed steelwork matches the design intent before anything is cut.

Do you prepare assembly and single-part drawings?

Yes, both. An assembly drawing shows a complete fabricated item, such as a beam with its end plates, stiffeners and cleats welded on, with the welds and the assembly mark. A single-part drawing shows one individual piece with its cutting length, hole positions, bevels and part mark.

The workshop works from both: single parts to cut and prepare the material, assemblies to fit and weld it together correctly.

Can you provide anchor-bolt and base-plate drawings?

Yes. Anchor-bolt setting-out drawings are usually the first thing issued on a project, because the bolts have to be cast or fixed before the steel arrives and a setting-out error there is expensive to correct later.

The drawings give bolt positions relative to the grid, projection, embedment where relevant, and the base-plate arrangement each group serves. Where the base-plate and anchor design itself falls within our scope, that sits with structural calculations.

Do you provide Tekla steel detailing in Dubai?

Yes. We support Tekla Structures project workflows for structural steel detailing in Dubai, together with AutoCAD and Advance Steel workflows for 2D detailing and consultant coordination, and SOLIDWORKS workflows for bespoke parts that sit outside a structural model.

Working this way keeps the model as the source: drawings, part marks, the bill of materials and the machine files are all derived from it, so a change is made once and carries through. Native-format model deliverables can be provided where included in the agreed project scope. See the CAD and BIM workflow question below for the full picture.

Can you provide DSTV or NC1 files for CNC fabrication?

Yes. DSTV NC1 files are exported from the detailing model for the beam and tube line, and DXF nests are produced for the lasers, so the machine cuts from the same geometry the drawing was taken from rather than from a re-keyed copy.

Where a project is being fabricated elsewhere, these files can form part of the issued package. What is included is agreed in the project scope.

Are shop drawings submitted for consultant approval before fabrication?

On projects with an appointed consultant, yes. The normal cycle is that drawings are issued for approval, the consultant reviews and returns them with comments or a status, the comments are incorporated, and the drawings are re-issued as approved for construction before material is cut.

The approval status and the review period are set by the project and the consultant's appointment, not by us, and we plan the detailing programme around them. Fabricating ahead of approval is a commercial risk that sits with whoever instructs it.

What is the difference between consultant’s drawings and shop drawings?

Under AISC 303 Section 4 (Plans and Specifications), the structural engineer of record (SER) issues the general arrangement drawings: member sizes, grades, loads and the typical connection details. The fabricator’s detailer then produces the shop drawings (piece-marked assembly and single-part drawings, weld symbols to AWS A2.4, bolt schedules, anchor-bolt setting plans and erection sequence) and submits them back to the SER for review and approval.

AISC 303 is explicit: the SER reviews shop drawings for general conformance with the design intent; the fabricator is responsible for accurate fits, dimensions and quantities. The same split is codified in BS EN 1090-1 Annex A and the EXC class requirements of BS EN 1090-2.

Reference: AISC 303-22 Code of Standard Practice for Steel Buildings and Bridges

Which CAD and BIM project workflows do you support?

  • Tekla Structures project environments for the primary structural BIM model, IFC export and DSTV NC1 output to the beam/tube line;
  • AutoCAD and Advance Steel workflows for 2D detailing and consultant coordination, including projects where the general arrangement arrives as a DWG file;
  • SOLIDWORKS project environments for bespoke parts: helical balustrades, sculpture armatures, sheet-metal flat patterns and complex tube intersections that sit outside a structural detailing model;
  • Navisworks-based project environments for federated model coordination and clash review between structural steel, RCC, MEP and architecture;
  • The project CDE, whichever the client nominates, for ISO 19650-compliant information delivery.

What standards do your shop drawings follow?

  • AISC 303 (Code of Standard Practice) for the scope split, approval cycle, and tolerance rules between SER, fabricator and erector;
  • BS EN 1090-1 / -2 for execution of steel structures, including the execution class (EXC1–4), inspection plan and CE marking documentation requirements;
  • AWS A2.4 & AWS A3.0 for welding symbols and weld terminology on drawings;
  • ISO 128 & ISO 129-1 for technical drawing conventions and dimensional tolerancing;
  • ISO 5817 for weld quality levels (B / C / D) called up by the consultant against EXC class;
  • BS EN ISO 13920 for general weld tolerances;
  • ISO 19650-1 / -2 for the BIM information management workflow on collaboratively delivered projects.

What BIM deliverables can you provide?

Working under ISO 19650 we deliver to the project’s BIM Execution Plan (BEP):

  • Native-format model deliverables can be provided where included in the agreed project scope, for full coordination handback;
  • IFC 2x3 / IFC 4 export for federation in Navisworks, Solibri or the project’s nominated review environment;
  • LOD/LOI compliance: typically LOD 300 at design issue, LOD 400 at fabrication issue, and LOD 500 (as-built) at handover, with the LOI (Level of Information) matrix agreed against the BEP;
  • Clash reports in BCF or PDF, resolved revision-by-revision;
  • COBie or asset data export where the client’s Asset Information Requirements (AIR) call for it.

Reference: ISO 19650-1:2018, Organization and digitization of information about buildings and civil engineering works including BIM

What does a typical detailing workflow look like?

  1. GA receipt & review: consultant’s stamped general arrangement, structural calc summary, architect’s elevations and BEP/AIR if a BIM job;
  2. Structural model development and coordination for Tekla Structures project environments against the approved GA, with connection design to AISC 360 (or Eurocode 3) for the typical details called up in the consultant’s specification;
  3. Internal squad check: second detailer reviews the model and approval-set drawings before issue;
  4. Approval issue to the consultant: assembly drawings, anchor-bolt setting plan, erection sequence, bolt schedule, weld map;
  5. Consultant review and comments incorporation, typically one or two cycles;
  6. AFC (Approved for Construction) issue to the workshop floor: single-part drawings, DSTV NC1 files, DXF nests, paint/HDG schedule;
  7. Erection package issue to site with marked-up sequence and lifting points;
  8. As-built capture of any site variations back into the federated model for handover.

More questions

Can you detail to a consultant’s code other than AISC?

Yes. The two codes adopted in Dubai under Administrative Resolution No. (37) of 2021 are AISC 360 (US) and Eurocode 3 / BS EN 1993 (European); we routinely detail to both. Where a consultant nominates BS 5950 for an older legacy project, we hold the typical-connection capacities under the original code and only migrate where the consultant calls for it. For projects in Saudi Arabia and Qatar we also detail to the Saudi Building Code (SBC 301 / 306) and to Qatar Construction Specifications (QCS) on request.

How are revisions and drawing control managed?

Every drawing carries a revision block. New revisions are clouded and tabulated in the revision history per ISO 7200. On Tekla Structures projects the revision flows through the model first: a part’s position number is stable while its geometry can be re-issued under a new drawing rev, and already-fabricated pieces are flagged against any new geometry change, so the workshop never builds yesterday’s revision.

On ISO 19650 projects, all drawings move through the sharedpublishedarchive CDE workflow with full audit trail; the last-published revision is the only one valid for procurement and fabrication.

Do you provide standalone detailing (without fabrication)?

Yes, but selectively. Our detailing team principally serves our own fabrication scope, where the value of the in-house detail/floor feedback loop is highest. Standalone detailing (producing shop drawings for another fabricator to build) is taken on for selected consultant/main-contractor clients where the project scope, programme and quality expectations align with our internal standards. Talk to us with the GA and we’ll come back on capacity.

What documents and files do I receive on handover?

  • PDF approval-set, AFC-set and as-built-set shop drawings, signed and stamped;
  • IFC 2x3 / IFC 4 export; native-format model deliverables can be provided where included in the agreed project scope;
  • Bespoke-part models and drawings from SOLIDWORKS project environments;
  • DSTV NC1 files for the beam/tube line and DXF nests for the lasers;
  • Bend-allowance and flat-pattern schedules for the press brake;
  • Weld map indexed to WPS, weld symbols per AWS A2.4;
  • Mill-cert pull list, paint & galvanizing schedule, NDT scope;
  • BIM CDE deliverables per the project BEP (clash reports, BCF, COBie if required);
  • ISO 9001-traceable QA records of internal squad checks and drawing approvals.

Why choose Finesse for steel shop drawings and detailing?

  • Detailers sit beside the floor. Connections are designed for what the workshop can actually cut, bend, weld and erect, not what reads cleanly on a PDF.
  • Code coverage. AISC 303 / 360 (US), Eurocode 3 / BS EN 1090 / BS EN 1993 (European), BS 5950 for legacy retrofits, SBC and QCS on request.
  • BIM-ready. The team coordinates models and drawings across Tekla Structures, AutoCAD, Advance Steel, SOLIDWORKS and Navisworks workflows, with ISO 19650 information delivery against any project BEP.
  • CNC-direct output. DSTV NC1 to the beam/tube line, DXF nests to the 6 kW lasers, bend allowances to the 170 t press, all under one revision-controlled model.
  • Internal squad check on every issue. Two detailer review before drawings ever leave the office.
  • ISO 9001 / 14001 / 45001 certified.

Send a GA package

Stamped GA,
structural spec,
programme.

That’s enough for us to scope detailing hours, BIM deliverables and a fixed quote.

Request a quote